Imam Hosein Metro Station Tehran

 Imam Hossein metro station on line 2 of Tehran metro with an area of ​​about 8000 square meters and a depth of 23 meters on three floors, which includes "ticket office", "office spaces, rooms of electrical, mechanical and air conditioners" and "passenger platform". Executed and launched by Soil and Water Engineering Company.

With the opening of this station in December 2006, the record of construction of a metro station in Tehran was reduced from 5 years to 2.5 years and a plaque of appreciation was presented to the company by the esteemed mayor of Tehran and about 40,000 trips were added to the capacity of Tehran metro lines.

Project Information

 

  • Employer Information:

 Tehran and Suburbs Urban Railway Company

  • Consultant:

 Pazhoohesh

  • Percentage of Progress:

100

  • Position:

Tehran

  • Tunnel Drilling Method:

Open Trench

 

Main Activities

  • Excavation:

 103,000 cubic meters

  • Reinforcement:

4,800 Tons

  • Formwork:

24,000 square meters

  • Concreting:

35,000 cubic meters

  • Shotcrete:

23,000 square meters

  • Metal Work:

2,500 Tons

  • Stone installation:

9,500 square meters