This station is located in line 4 of Tehran metro and has been done in six sub-projects, which are:
Construction of G`4 station, which is located at the intersection of Valiasr and has been carried out by two methods of ribbing (Russian) and NATM (Austrian) method with an infrastructure area of approximately 10,000 square meters.
Construction of a three-way connecting line 4 to 3 with a length of 80 meters
Construction of a ventilator between the I4G4 tunnel, which is in the form of an open trench
Construction of Amirkabir substation building to supply electricity required by metro lines with about 6500 square meters of infrastructure at the College intersection next to the building of Tehran Metro Command Center, whose concrete structure with a bending frame system and shear wall was executed on the radius foundation.
Construction of rectifier
Construction of a ceremonial platform at the intersection of the college
Project Information |
|
|
Tehran Urban and Suburban Railway Co. |
|
Behro |
|
100 |
|
Tehran |
|
Ribbing & NATM |
|
2011 |
Main Activities |
|
|
102,000 cubic meters |
|
73,700 square meters |
|
770 meters |
|
6,500 tons |
|
57,000 square meters |
|
78,000 cubic meters |
|
32,000 square meters |